O8 — Modular Surfaces & Concrete Footways

Find It in the SROH

Look-up drills: you are given a heading and asked which document and section it belongs to.

Question 1 of 3
0 correct 0 incorrect

Free O8 questions: Find It in the SROH

These questions are in the practice set above. Answer them there to see the correct option and the explanation for each.

  • An undertaker has completed its work beneath a modular footway and must decide how much of the reinstatement to build now and how much to carry over to a second visit. Which provision sets out the methods the Code allows for a footway, a footpath or a cycle track?
  • A duct is to be laid along a flagged surface that carries pedestrians rather than vehicles, in a slot cut into it rather than in a conventional excavation, and the crew needs the provision that settles whether the Code permits that where the surface is laid in modules rather than in bituminous material.
  • A reinstatement in a modular road runs a long way along the line of traffic, and the authority means to check how even the finished surface is along it. The gang wants the provision that states what the Code allows there and how the check is made.

10 questions on this topic in the app

Plus the rest of O8 — 81 questions in total — and a timed mock test you can retake as often as you like.