S1 — Monitoring Signing, Lighting & Guarding
Find It in the Red Book
Look-up drills: you are given a heading and asked which document and section it belongs to.
Question 1 of 3
0 correct 0 incorrect
Free S1 questions: Find It in the Red Book
These questions are in the practice set above. Answer them there to see the correct option and the explanation for each.
- On a monitoring visit you find a layout shrunk for the night: no operatives on site, no open excavation, plant, materials or spoil heap left inside it, and no pedestrian walkway in the carriageway. Before you sign off the smaller layout, and decide what the crew must do when work restarts, which page sets the rule you apply?
- A survey you are checking proposes a walkway in the carriageway, because safe pedestrian access cannot be kept on the footway and no safe off-carriageway alternative has been found. Before you accept or reject the proposed walkway width, which page gives the figures you check it against?
- A traffic management plan you are checking names one way of controlling traffic but gives no reason for preferring it. Before you sign it off, you want every option's limits set out side by side. Which page has that table?
10 questions on this topic in the app
Plus the rest of S1 — 80 questions in total — and a timed mock test you can retake as often as you like.