S2 — Monitoring Excavation
Find It in the SROH & HSG47
Look-up drills: you are given a heading and asked which document and section it belongs to.
Question 1 of 3
0 correct 0 incorrect
Free S2 questions: Find It in the SROH & HSG47
These questions are in the practice set above. Answer them there to see the correct option and the explanation for each.
- A crew's dig doesn't obviously match any of the sizes a supervisor normally expects, and before the reinstatement can even be designed the paperwork needs the right label put on it. Which provision sets out those labels?
- Loose rubble and saturated soil are showing at the base of a dig, and the crew wants to know whether what's coming up counts as something the Code calls out and treats differently from ordinary conditions. Which provision sets that out?
- One side of a hole has been left leaning inward under the running surface, and water keeps finding its way in faster than the crew can keep it out. Which provision covers how the hole itself should have been cut and protected?
10 questions on this topic in the app
Plus the rest of S2 — 60 questions in total — and a timed mock test you can retake as often as you like.
More free S2 practice
- Monitoring Excavation — 10 free questions
NRSWA Revision: Street Works is independent revision material. It is not affiliated with, endorsed by or approved by HAUC(UK), SWQR, any awarding organisation or the Department for Transport, and it does not award a qualification or a card.