S7 — Monitoring Modular & Concrete Footways

Find It in the SROH

Look-up drills: you are given a heading and asked which document and section it belongs to.

Question 1 of 3
0 correct 0 incorrect

Free S7 questions: Find It in the SROH

These questions are in the practice set above. Answer them there to see the correct option and the explanation for each.

  • A modular footway was reinstated to an interim standard and made permanent some weeks later. The undertaker says the guarantee period on it has already run out. The supervisor is not sure the period even started when the undertaker thinks it did, and wants the provision that settles it. Under SROH, which provision covers this?
  • A gang has sawn a slot through the pavement to lay a duct, far thinner than a spade's blade and running past several properties, with the paving around it undamaged. The paperwork will not accept the work until the cut is recorded as one of the kinds this Code recognises, and the gang cannot agree which of those kinds they have made. Under SROH, which provision covers this?
  • Well into the guarantee period, an inspector lays a straightedge along a reinstatement in a modular road and finds a run of dips and humps in it. The undertaker says a surface that old is bound to show some and that these are within what is allowed. The supervisor needs the provision that decides it. Under SROH, which provision covers this?

10 questions on this topic in the app

Plus the rest of S7 — 55 questions in total — and a timed mock test you can retake as often as you like.